28Why the eia procedure is invalid?
發布時間:2021-08-04 信息來源:海南椰林環境科技有限公司
A: 1) The construction site changes;
2) The production process changes or increases;
3) Production facilities have changed or increased;
4) Production capacity has expanded;
5) Reduce the eia grade;
6) Ultra vires approval.