In order to further strengthen the management of environmental protection, establish and improve the emergency response mechanism for environmental emergencies, and further strengthen the earnest study of employees in all departments of the enterprise, and do a good job of emergency preparedness and emergency drills, to improve the ability of enterprises to cope with emergencies, Hainan Yuehai Water Co. , Ltd Danzhou Binhai New Area Sewage Treatment No. 1 factory and Hainan Yilin Environmental Technology Co. , Ltd. .
Danzhou Binhai New Area Sewage Treatment No. 1 plant project is located in Danzhou Binhai New Area Zhongliuheng road north side, Tenggen River South Bank (N: 19 ° 41’37.75”E: 109 ° 13’56.60”) . The total area of the project is 66345.9 M2, the total design scale is 80,000 tons per day of sewage treatment, sewage treatment using improved A2/O + advanced treatment process. The project is constructed by stages. The scale of the main production structures in the near future is 40,000 m3/d. Only one group of technological equipment is installed and the scale is 40,000 m3/d, ancillary structures such as complex building, machine repair warehouse, sludge dewatering workshop, dosing and disinfection room. The short-term overall construction of the project mainly includes the civil engineering of production structures and subsidiary structures, the installation of process and equipment, the road and landscape greening of the plant area, the electrical engineering of the plant area, the automatic control and instrumentation engineering of the plant area. The total investment of the project was 239.788 million yuan, of which 2.5 million yuan was invested in environmental protection, accounting for 1.04 percent of the total investment. Construction of the project started on April 2,2017, and was completed in May 2018. The project was put into trial operation in July 2018.